| Selwyn Harding, Company Director will host the Technical Tour and outline the design, procurement and construction phases of the plant and enlighten members on its technical features. Tour attendance to be followed by pizza, soft drink and networking is free and non-members are most welcome. | |
| Venue | Hardings Hotmix 30 Industrial Drive, Ulverstone, |
| Date | Wednesday, 20 June 2012 4.15pm to 6.00om |
| Event Contact | Rowan Sharman |
| Contact Phone | 6430 5752 |
| Contact Email | rsharman@burnie.net |
| Downloads | nth_west_site_tour_to_hardings_hotmix_20062012.pdf(452KB) |
4.15pm Assemby
4.30 pm Technical Tour Start
5.30 pm Food and Networking
In October 2011 Hardings Hotmix Pty Ltd produced the first batch of hotmix asphalt from its new plant at 30 Industrial Drive, Ulverstone, which signaled the beginning of their new Asphalt Production Division and a new era for the Civil Construction and Materials Supply company.
The plant runs on liquid natural gas and all operations are computerized. It is capable of producing up to 80 tonnes of asphalt per hour and has a heated storage bin capacity of 50 tonnes.
The plant operates under strict environmental and energy consumption guidelines which include the recycling of waste materials through the plant.





