Fast and Simple AS5100 Bridge Engineering, by MIDAS IT

12.00 pm — 1.45 pm AEST, 11 June 2024
Webinar

Overview

The world is changing rapidly with new technologies and Australia’s infrastructure industry is consistently advancing, but how are you keeping pace with this speed?

Discover fast and simple procedures using midas Civil, featuring optimised modeling, analysis and design processes tailored for Australian engineers.

Through this webinar, you will be able to explore MIDAS IT’s bridge engineering software and technologies.

Join us, connect with other professional civil engineers and together experience the new era of bridge design.

Agenda (120 mins)

  • 12:00 ~ 12:05: Introduction to MIDAS IT Webinar – Amanda Rodgers
  • 12:06 ~ 12:20: Introduction to MIDAS IT (VIDEO)
  • 12:20 ~ 12: 48: Introduction to midas Civil (Speaker: Pranav Vaishampayan)
  • 12:48 ~ 12:50: User Interview (VIDEO)
  • 12:50 ~ 13:20 Project Application 1 “Caulfield to Dandenong Level Crossing Removal Project: Continuous Span Staged Analysis & Temporary Work Design using midas Civil” (Speaker: Dylan Jesse)  
  • 13:20 ~ 13:40 Project Application 2 “Modeling a Pedestrian Cable-Stay Bridge using midas Civil” (Speaker: Kevin Cheng)  
  • 13:40 ~ 14:00 : Panel Q&A Session

Who should attend

This webinar is relevant for civil, structural and bridge engineers.

You do not need to be an Engineers Australia member to attend.

Speakers

kevin-cheng-160
Kevin Cheng
Experienced Bridge Engineer, Red Fox Advisory

Kevin is an experienced bridge engineer, having significantly contributed to various major infrastructure projects, including the Byford Rail Extension, Cross River Rail, Rockhampton Ring Road, and Bruce Highway Upgrade. He recently led the design and construction of two challenging projects: a fast-tracked completion of a 96m long road bridge and a 100m span pedestrian cable stay bridge, assuming roles as both project manager and lead structural engineer.

dylan-jesse-160
Dylan Jesse
Lead Bridge Engineer, Aurecon

Dylan is a Lead Bridge Engineer with over 11 years of experience in the design and assessment of bridges and civil structures across Australia. Dylan has gained specialist technical knowledge in the modelling and analysis of pre-stressed concrete, post-tensioned concrete, and steel bridges. Dylan has experience from a broad range of major projects, including the Avon River Bridge Upgrade Project, Moreton Bay Rail Project and the Furlong Main Blackburn Heatherdale and Caulfield to Dandenong Level Crossing Removal projects. Dylan is currently leading the construction phase services for the viaduct structures of the Wurundjeri Way Extension of the West Gate Tunnel Project.

amy-hur-160
Amy Hur
Technical Account Manager, MIDAS IT

Working as a Technical account manager in Midas It, she has extensive knowledge of Midas Software. She has proven his proficiency at Midas IT and has been assisting on providing technical support, training, and solutions to clients for products like Midas Civil.

Pricing
Online
Member: Free
Technical Society Member: Free
Student: Free
Non-Member: Free
Registration close
11 June 2024
01.45 pm AEST