Melbourne Metro Tunnel Project: Temporary Works Design and Management

Start time: 12.00pm AEST. The Metro Tunnel Project is the largest public transport infrastructure project in Victoria’s history, but it’s not just the final product that is complex. Learn about the significant engineering challenges that have been met during the temporary construction phases.
Metro tunnel

The Metro Tunnel Project is the largest public transport infrastructure project in Victoria’s history, but it’s not just the final product that is complex.

This presentation highlights the significant engineering challenges that have been met during the temporary construction phases.

Speaker

Brendan Stanborough MIEAust CPEng NER: Temporary Works Design Manager, Bouygues Construction

Brendan Stanborough MIEAust CPEng NER is a Civil Engineer working for Bouygues Construction as a Temporary Works design manager. He is currently responsible for the delivery of Temporary Work designs and procedural controls from conception through to decommission for the Melbourne Metro Tunnel project. During his career he has worked for both consultant and contractor in the areas of structural, civils, infrastructure and Temporary Works. In recent years he has worked on major infrastructure projects including several in the United Kingdom through which he has gained insight into the issues around safe and successful delivery of Temporary Works.

Date:
27 / 08 / 2020 - 12:00 pm to 01:00 pm
Registration Closes
27 / 08 / 2020 01:00 pm
Cost
Registration
  • EA Member Rate: $0.00 ($0.00 excl. GST)
  • Student Member Rate: $0.00 ($0.00 excl. GST)
  • Non-Member Rate: $30.00 ($27.27 excl. GST)
Key Speaker(s)
Brendan Stanborough MIEAust CPEng NER
Host(s)
Engineers Australia
Event Contact
  • Contact:
    Engineers Australia Member Services
  • Phone:
    1300 653 113
  • Email:
Maximum CPD Hours
1