Photo-Voltaic Power Plants influence on Grids

Start time: 7pm Abu Dhabi Time. Discover how Photo-Voltaic Power Plants at distribution networks has a positive influence on grids.
Photo-Voltaic Power Plants influence on Grids

This event is at 7pm Abu Dhabi time.

 

OVERVIEW

This session will discuss, compile & conclude the influence of Phot-Voltaic Power Plants that are connected at Distribution Grids. The main themes includes:
• Investigation of PV Plants suitability to be connected to a  Distribution Grid throughout Grid Impact Study [GIS].
• Role of PV Plants at Distribution Networks in enhancing Power System Stability and its relations with Anti-Islanding and other G59/G99 Relay Settings; its relationship with Load-Shedding Schemes at Transmission Grid.
• PV Plants as a Distributed Generation Plants.
• Reduction of MV & LV Electrical Losses due to connected PV Plants at Distribution Grid.
• Carbon Foot-Print improvement caused by PV Plants connected at Distribution Networks.
 

SPEAKER

Speaker

Ghaith Khzai

Digital Transformation & Smart Grid
Jordan Electricity (JEPCO)
 
Ghaith Khzai is a notable figure at Renewable Energy Market in the Middle-East region; nevertheless, he also has a proven record in developing and implementation of more than 304 MWp PV plants at Distribution Grids.
 
Engineer GK is deeply involved at Photo-Voltaic Power Plants, & Electricity Distribution Grids from both Technical & Commercial aspects; he has diversified experience as he worked in deep technical details of Engineering, Testing & Commissioning at Jordan National Grid & Engineering Dept. Director at Electricity Distribution Company (EDCO). His previous roles include Siemens Energy, ABB Power Grid  and Kawar Energy Jordan. 
 
Date:
30 / 09 / 2021 - 07:00 pm to 08:00 pm
Registration Closes
30 / 09 / 2021 07:00 pm
Hybrid
Cost
  • Members:
    Free
  • Non Members:
    Free
Cost
Webinar
  • Member Rate: $0.00 ($0.00 excl. GST)
  • Student Member Rate: $0.00 ($0.00 excl. GST)
  • Non-Member Rate: $0.00 ($0.00 excl. GST)
Event Contact
Maximum CPD Hours
1