Welcoming PDC as a WA Division Supporter Monday, 11 May 2015

PDC is a company of over 450 staff members covering full and complimentary Design, Detailing and BIM services. PDC services the global market in the Resources, Property and Infrastructure sectors. 

PDC’s point of difference is their commitment to work with technology and partner with clients to go beyond the traditional engineering firm, delivering full life cycle solutions from innovative concepts through to a build ready plan. This includes asset management through the use of latest 3D Building Information Modelling technologies and the experience of our team.

PDC believes the loss of project continuity and knowledge through splitting work across separate design, engineering, detailing and project management suppliers is a critical preventable cost to clients. That’s why they have developed advanced management, modelling and detailing technology to enable the transparent and complete delivery of integrated engineering to their clients. The passion for efficiency underpins a result with reduced health, safety and environmental risks. Their systems enable lean, repeatable designs to minimize operational and materials waste, as well as land clearance. The high level accuracy of PDC’s designs also means less work overall and no re-work, reducing fatigue from time spent on site.

“For PDC, our use of innovative technology is not an afterthought. Innovation throughout the process and the use of advanced tools are fundamental to our designs. If the technology doesn’t do what we need it to, right from the concept stage, we develop our own. This is why we are so focused on attracting and maintaining both industry leaders and up and-coming high performers to our team.” – Martyn Weir, CEO

Recent work on the Perth Children’s Hospital with John Holland demonstrates how BIM can be used in the management and maintenance of a facility after construction is completed. BIM to Facilities Management. PDC take the large number of separate models from multiple project consultants created in various software platforms and federates to create a weekly BIM model which are distributed across the relevant project groups. This ensures conformity, prevents clashes, avoids duplication and promotes real-time communication.

Recently awarded multiple packages on the Perth Stadium including BIM Management, detailing and animation development using Timeliner Construction Methodology PDC is playing a significant role in WA’s commercial construction arena.

‘Engineering evolved’ means more complete, more effective and greater value project delivery for each client.